Saturday was WWKIP day (or at least one of them). There was an event at our local mall.  DH agreed to watch the two boys (something he never does alone) so that I could go.  It was great.  I worked on my Shawl that Jazz. I got to the beginning of the ruffle on it. I am still on the first skein, so I am going to do the extra ruffly ruffle.  I might also make the ruffle a bit longer.  I learned that there is a local group that meets 2 Sundays a month.  I am going to start going to that. I am pretty excited. It is hard for me to go to group in Gainesville because the drive is so long. A 2 hour knitting group becomes a nearly 4 hour trip.  This avoids all that travel time, so I am able to go more often!  I am pretty excited.

We also had the option of making a donation and getting a goody bag.  The goody bag was great. There was a skein of yarn. It was Classic Elite.  It came with 2 soap sweater patterns. I love these things!  I can’t wait to make one.  I think my first one will be out of this yarn for my mom. I bought her some handmade soap at Hanks for her birthday (in January…yes, it is still in my house). I think I am going to put a sweater on that yummy soap!  The bag had all kinds of coupons and adds for local crafty places. There was some wool wash and lotion, a needle gauge, a ruler, and a button too.  It was pretty fun!

While I was there, several people were knitting 2-at-a-time socks toe up.  I have been thinking about knitting toe up socks.  I promised myself that I would not cast on any socks until I finished DH’s socks.  I had gotten to the toe decreases and realized I was still on my first skein of Lorna’s Laces (this was about 6 weeks ago). There is no way I should be able to get a whole sock for DH out of one skein of LL.  I had that sick feeling that the sock was too small. Naturally, I did what any good knitter does…I put the sock in a drawer hoping it would grow on it’s own.  While watching everyone knitting socks, I confessed that I had DH’s socks in timeout.   I was told to get them out, frog them, and cast on a toe up sock for DH out of the yarn.  I decided this was a fantastic idea as it kills two birds with one stone.  I have decided that I will not only do a toe up sock for DH, but I will go ahead and do it 2-at-a-time (on one circ).  I have an extra 47″ cable, so I just need some tips. I am going to make a Knit Picks order tomorrow and will add those on.  I ordered 2-at-a-time Socks by Melissa Morgan-Oakes today too.  I think I am going to ditch the Monkeymen pattern for know. I think I am just going to do a ribbed sock.  So my knitting disaster that I have been avoiding has turned into an opportunity to learn something new.  So, I celebrated WWKIP day by frogging a nearly complete sock!

I have also finished the second April Square. I have one more April Square to do. Then I have to do the May and June squares!  For some reason, I don’t love knitting the April Square. I haven’t been working on them. I am excited to try the May one. It is a cabled square.  I have never done cables.  Even that has not gotten me moving like it should.  Once I get this last April Square done, things should pick up on the blanket making!

Advertisements